Hello world!
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!
Bukmeker Kontoru BetAndreas Then do the following. Phone Number: 580 623 7333 Fax...
Vivian If your intention is to build a bankroll from small beginnings, it’s...
You must be logged in to post a comment.
1. Size of Power Plant | |
Feasible Plant size as per your : | kW |
2. Cost of the Plant : | |
MNRE current Benchmark Cost (without GST) : | Rs. Rs. / kW |
View Benchmark Cost List | |
Without subsidy (Based on current MNRE benchmark without GST) : | Rs. |
With subsidy (Based on current MNRE benchmark without GST) : | Rs. |
3. Total Electricity Generation from Solar Plant : | |
Annual : | kWh |
Life-Time (25 years): | kWh |
4) Financial Savings : | |
a) Tariff @ Rs./ kWh (for top slab of traffic) - No increase assumed over 25 years : | |
Monthly : | Rs. |
Annually : | Rs. |
Life-Time (25 years) : | Rs. |
Carbon dioxide emissions mitigated is | tonnes. |
This installation will be equivalent to planting | Teak trees over the life time. (Data from IISc)
|
Disclaimer: The calculation is indicative in nature. Generation may vary from location to location. |
for Loan amount of Rs. for loan period of years @ % is Rs. / month
Hi, this is a comment.
To get started with moderating, editing, and deleting comments, please visit the Comments screen in the dashboard.
Commenter avatars come from Gravatar.